Substation for the Parc du Banc de Guérande
Substation for the Parc du Banc de Guérande
Ordered in 2019 by the Parc du Banc de Guérande company, which is an EMF subsidiary (a consortium of company consisting of EDF Renouvlables – French electricity provider – Enbridge Inc and WPD Offshore), will be operational in 2022. Positioned in a wind farm of 80 wind turbines for a cumulated power production of 480 MW, it will be the very first substation installed in a French wind farm.
Organization of the contract
The consortium gathers the expertise of Atlantique Offshore Energy – in charge of the designing, manufacturing and commissioning of the topside and the Jacket structure – of GE Grid Solution – in charge of the designing, manufacturing and commissioning of the high and medium voltage electrical equipment as well as the safety and the control and command equipment – and of SDI – in charge of the transportation and installation of the structures.